Georgia vs United Arab Emirates: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Georgia
- United Arab Emirates
How they compare
Georgia currently reports 63 days against 47.5 days in United Arab Emirates, a difference of 15.5 days.
That makes Georgia's figure about 1.3 times United Arab Emirates's.
Across all 15 years both countries report, Georgia has been ahead every year.
Georgia ranks 178th and United Arab Emirates ranks 181st of 185 countries.
Georgia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Georgia | United Arab Emirates | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 135.3 days | 76.1 days | 59.2 days | Georgia |
| 2010s | 68.65 days | 48.25 days | 20.4 days | Georgia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Georgia or United Arab Emirates?
- Georgia, at 63 days against 47.5 days in United Arab Emirates as of 2019.
- What is the difference in dealing with construction permits: time between Georgia and United Arab Emirates?
- 15.5 days, with Georgia ahead.
- How many years of comparable data are there for Georgia and United Arab Emirates?
- 15 years are reported by both, from 2005 to 2019.
- How do Georgia and United Arab Emirates rank globally for dealing with construction permits: time?
- Georgia ranks 178th and United Arab Emirates ranks 181st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.