Germany vs Iran: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Germany
- Iran
How they compare
Iran currently reports 130 days against 126 days in Germany, a difference of 4 days.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Iran ahead.
Germany ranks 104th and Iran ranks 103rd of 185 countries.
Across the 2 decades both report, Germany averaged higher in 1 and Iran in 1.
Head to head by decade
| Decade | Germany | Iran | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 132.4 days | 341.6 days | 209.2 days | Iran |
| 2010s | 126 days | 109 days | 17 days | Germany |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Germany or Iran?
- Iran, at 130 days against 126 days in Germany as of 2019.
- What is the difference in dealing with construction permits: time between Germany and Iran?
- 4 days, with Iran ahead.
- How many years of comparable data are there for Germany and Iran?
- 15 years are reported by both, from 2005 to 2019.
- How do Germany and Iran rank globally for dealing with construction permits: time?
- Germany ranks 104th and Iran ranks 103rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.