Dealing with construction permits: Time in Iran

Iran: Dealing with construction permits: Time was 130 days in 2019. ◆ Volatile

Latest (2019)
130 days
Change on year
unchanged
World rank
103rd
of 185 countries
All-time high
402 days
in 2005
All-time low
100 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Iran, 2005–2019

1002003004002005201220192005: 402 days2006: 402 days2007: 402 days2008: 402 days2009: 100 days2010: 100 days2011: 100 days2012: 100 days2013: 100 days2014: 100 days2015: 100 days2016: 100 days2017: 130 days2018: 130 days2019: 130 days

Source: World Bank. Measured in days.

Analysis

Iran recorded 130 days for dealing with construction permits: time in 2019.

Compared with earlier readings it is up 30.0% over ten years.

Over the whole period, dealing with construction permits: time in Iran peaked at 402 days in 2005 and was at its lowest, 100 days, in 2009.

Iran ranks 103rd of 185 countries on this measure, in the middle of the range.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 341.6 days 100 days 402 days 5
2010s 109 days 100 days 130 days 10

Countries ranked near Iran

  1. 101 Algeria 131 days compare
  2. 101 South Sudan 131 days compare
  3. 104 Cameroon 126 days compare
  4. 104 Germany 126 days compare
  5. 106 Oman 125 days compare

See the full ranking of 187 places →

More private sector data for Iran

All data for Iran →

Frequently asked questions

What is dealing with construction permits: time in Iran?
Dealing with construction permits: time in Iran was 130 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Iran?
The highest recorded value was 402 days in 2005.
What is the lowest dealing with construction permits: time recorded in Iran?
The lowest recorded value was 100 days in 2009.
How does Iran rank for dealing with construction permits: time?
Iran ranks 103rd out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Iran?
Over the last ten years it is up 30.0%. The long-run trend across the full record is volatile.
Where does this Iran data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.