Dealing with construction permits: Time in Iran
Iran: Dealing with construction permits: Time was 130 days in 2019. ◆ Volatile
Dealing with construction permits: Time in Iran, 2005–2019
Source: World Bank. Measured in days.
Analysis
Iran recorded 130 days for dealing with construction permits: time in 2019.
Compared with earlier readings it is up 30.0% over ten years.
Over the whole period, dealing with construction permits: time in Iran peaked at 402 days in 2005 and was at its lowest, 100 days, in 2009.
Iran ranks 103rd of 185 countries on this measure, in the middle of the range.
The series is highly variable year to year, so single readings are best treated with caution.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 341.6 days | 100 days | 402 days | 5 |
| 2010s | 109 days | 100 days | 130 days | 10 |
Countries ranked near Iran
More private sector data for Iran
- Merchandise trade 49.3% (2025)
- Food imports 29.5% (2022)
- Manufactures imports 58.1% (2022)
- Merchandise imports 65.63 billion current US$ (2025)
- Food exports 5.9% (2022)
- Manufactures exports 31.3% (2022)
- Merchandise exports 113.22 billion current US$ (2025)
- Commercial service exports 1.36 billion current US$ (2000)
- Transport services 72.4% (2000)
- Computer, communications and other services 1.1% (2000)
Frequently asked questions
- What is dealing with construction permits: time in Iran?
- Dealing with construction permits: time in Iran was 130 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Iran?
- The highest recorded value was 402 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Iran?
- The lowest recorded value was 100 days in 2009.
- How does Iran rank for dealing with construction permits: time?
- Iran ranks 103rd out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Iran?
- Over the last ten years it is up 30.0%. The long-run trend across the full record is volatile.
- Where does this Iran data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.