Germany vs Oman: Dealing with construction permits: Time

Germany
126 days
in 2019
Oman
125 days
in 2019
Germany rank
104th
Oman rank
106th

Dealing with construction permits: Time over time

  • Germany
  • Oman
050100150200520122019

How they compare

Germany currently reports 126 days against 125 days in Oman, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Germany ahead.

Germany ranks 104th and Oman ranks 106th of 185 countries.

Oman has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Germany Oman Difference Ahead
2000s 132.4 days 137 days 4.6 days Oman
2010s 126 days 126.2 days 0.2 days Oman

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Germany or Oman?
Germany, at 126 days against 125 days in Oman as of 2019.
What is the difference in dealing with construction permits: time between Germany and Oman?
1 days, with Germany ahead.
How many years of comparable data are there for Germany and Oman?
15 years are reported by both, from 2005 to 2019.
How do Germany and Oman rank globally for dealing with construction permits: time?
Germany ranks 104th and Oman ranks 106th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.