Ghana vs Kyrgyzstan: Dealing with construction permits: Time

Ghana
170 days
in 2019
Kyrgyzstan
167 days
in 2019
Ghana rank
60th
Kyrgyzstan rank
62nd

Dealing with construction permits: Time over time

  • Ghana
  • Kyrgyzstan
0100200300400200520122019

How they compare

Ghana currently reports 170 days against 167 days in Kyrgyzstan, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Kyrgyzstan ahead.

Ghana ranks 60th and Kyrgyzstan ranks 62nd of 187 countries.

Across the 2 decades both report, Ghana averaged higher in 1 and Kyrgyzstan in 1.

Head to head by decade

Decade Ghana Kyrgyzstan Difference Ahead
2000s 215 days 313.2 days 98.2 days Kyrgyzstan
2010s 188 days 163.4 days 24.6 days Ghana

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Ghana or Kyrgyzstan?
Ghana, at 170 days against 167 days in Kyrgyzstan as of 2019.
What is the difference in dealing with construction permits: time between Ghana and Kyrgyzstan?
3 days, with Ghana ahead.
How many years of comparable data are there for Ghana and Kyrgyzstan?
15 years are reported by both, from 2005 to 2019.
How do Ghana and Kyrgyzstan rank globally for dealing with construction permits: time?
Ghana ranks 60th and Kyrgyzstan ranks 62nd of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Ghana vs Kyrgyzstan: Dealing with construction permits: Time. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ghana/kyrgyz-republic/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/ghana/kyrgyz-republic/">Ghana vs Kyrgyzstan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.