Greece vs Lesotho: Dealing with construction permits: Time (days) (Time days)

Greece
180 days
in 2019
Lesotho
183 days
in 2019
Greece rank
53rd
Lesotho rank
51st

Dealing with construction permits: Time (days) (Time days) over time

  • Greece
  • Lesotho
0100200300400200520122019

How they compare

Lesotho currently reports 183 days against 180 days in Greece, a difference of 3 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Lesotho ahead.

Greece ranks 53rd and Lesotho ranks 51st of 188 countries.

Across the 2 decades both report, Greece averaged higher in 1 and Lesotho in 1.

Head to head by decade

Decade Greece Lesotho Difference Ahead
2000s 245 days 375 days 130 days Lesotho
2010s 193.6 days 183 days 10.6 days Greece

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Greece or Lesotho?
Lesotho, at 183 days against 180 days in Greece as of 2019.
What is the difference in dealing with construction permits: time between Greece and Lesotho?
3 days, with Lesotho ahead.
How many years of comparable data are there for Greece and Lesotho?
15 years are reported by both, from 2005 to 2019.
How do Greece and Lesotho rank globally for dealing with construction permits: time?
Greece ranks 53rd and Lesotho ranks 51st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Greece vs Lesotho: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/greece/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/greece/lesotho/">Greece vs Lesotho: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.