Dealing with construction permits: Time in Greece

Greece: Dealing with construction permits: Time was 180 days in 2019. ▼ Falling

Latest (2019)
180 days
Change on year
unchanged
World rank
51st
of 185 countries
All-time high
245 days
in 2005
All-time low
180 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Greece, 2005–2019

0501001502002502005201220192005: 245 days2006: 245 days2007: 245 days2008: 245 days2009: 245 days2010: 245 days2011: 245 days2012: 181 days2013: 181 days2014: 181 days2015: 181 days2016: 181 days2017: 181 days2018: 180 days2019: 180 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Greece is 180 days, measured in 2019. That is the lowest value across all 15 years on record.

The figure is down 26.5% over ten years.

Over the whole period, dealing with construction permits: time in Greece peaked at 245 days in 2005 and was at its lowest, 180 days, in 2018.

Greece ranks 51st of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 245 days 245 days 245 days 5
2010s 193.6 days 180 days 245 days 10

Countries ranked near Greece

  1. 49 Lesotho 183 days compare
  2. 50 Sierra Leone 182 days compare
  3. 51 Bahamas, The 180 days compare
  4. 51 Bosnia and Herzegovina 180 days compare
  5. 54 Malta 179 days compare

See the full ranking of 187 places →

More private sector data for Greece

All data for Greece →

Frequently asked questions

What is dealing with construction permits: time in Greece?
Dealing with construction permits: time in Greece was 180 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Greece?
The highest recorded value was 245 days in 2005.
What is the lowest dealing with construction permits: time recorded in Greece?
The lowest recorded value was 180 days in 2018.
How does Greece rank for dealing with construction permits: time?
Greece ranks 51st out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Greece?
Over the last ten years it is down 26.5%. The long-run trend across the full record is falling.
Where does this Greece data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.