Greece vs Sierra Leone: Dealing with construction permits: Time

Greece
180 days
in 2019
Sierra Leone
182 days
in 2019
Greece rank
51st
Sierra Leone rank
50th

Dealing with construction permits: Time over time

  • Greece
  • Sierra Leone
050100150200250200520122019

How they compare

Sierra Leone currently reports 182 days against 180 days in Greece, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Greece ahead.

Greece ranks 51st and Sierra Leone ranks 50th of 185 countries.

Greece has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Greece Sierra Leone Difference Ahead
2000s 245 days 213.2 days 31.8 days Greece
2010s 193.6 days 182.1 days 11.5 days Greece

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Greece or Sierra Leone?
Sierra Leone, at 182 days against 180 days in Greece as of 2019.
What is the difference in dealing with construction permits: time between Greece and Sierra Leone?
2 days, with Sierra Leone ahead.
How many years of comparable data are there for Greece and Sierra Leone?
15 years are reported by both, from 2005 to 2019.
How do Greece and Sierra Leone rank globally for dealing with construction permits: time?
Greece ranks 51st and Sierra Leone ranks 50th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.