Dealing with construction permits: Time in Sierra Leone

Sierra Leone: Dealing with construction permits: Time was 182 days in 2019. ▼ Falling

Latest (2019)
182 days
Change on year
unchanged
World rank
50th
of 185 countries
All-time high
222 days
in 2005
All-time low
182 days
in 2011
Years of data
15
2005–2019

Dealing with construction permits: Time in Sierra Leone, 2005–2019

0501001502002005201220192005: 222 days2006: 222 days2007: 222 days2008: 200 days2009: 200 days2010: 183 days2011: 182 days2012: 182 days2013: 182 days2014: 182 days2015: 182 days2016: 182 days2017: 182 days2018: 182 days2019: 182 days

Source: World Bank. Measured in days.

Analysis

Sierra Leone recorded 182 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 9.0% over ten years.

Over the whole period, dealing with construction permits: time in Sierra Leone peaked at 222 days in 2005 and was at its lowest, 182 days, in 2011.

Sierra Leone ranks 50th of 185 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 213.2 days 200 days 222 days 5
2010s 182.1 days 182 days 183 days 10

Countries ranked near Sierra Leone

  1. 49 Lesotho 183 days compare
  2. 51 Bahamas 180 days compare
  3. 51 Bosnia and Herzegovina 180 days compare
  4. 51 Greece 180 days compare

See the full ranking of 187 places →

More private sector data for Sierra Leone

All data for Sierra Leone →

Frequently asked questions

What is dealing with construction permits: time in Sierra Leone?
Dealing with construction permits: time in Sierra Leone was 182 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Sierra Leone?
The highest recorded value was 222 days in 2005.
What is the lowest dealing with construction permits: time recorded in Sierra Leone?
The lowest recorded value was 182 days in 2011.
How does Sierra Leone rank for dealing with construction permits: time?
Sierra Leone ranks 50th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Sierra Leone?
Over the last ten years it is down 9.0%. The long-run trend across the full record is falling.
Where does this Sierra Leone data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.