Grenada vs Guinea: Dealing with construction permits: Time (days) (Time days)

Grenada
146 days
in 2019
Guinea
151 days
in 2019
Grenada rank
84th
Guinea rank
81st

Dealing with construction permits: Time (days) (Time days) over time

  • Grenada
  • Guinea
050100150200200520122019

How they compare

Guinea currently reports 151 days against 146 days in Grenada, a difference of 5 days.

Across all 15 years both countries report, Guinea has been ahead every year.

Grenada ranks 84th and Guinea ranks 81st of 188 countries.

Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Grenada Guinea Difference Ahead
2000s 146 days 181 days 35 days Guinea
2010s 146 days 173.1 days 27.1 days Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Grenada or Guinea?
Guinea, at 151 days against 146 days in Grenada as of 2019.
What is the difference in dealing with construction permits: time between Grenada and Guinea?
5 days, with Guinea ahead.
How many years of comparable data are there for Grenada and Guinea?
15 years are reported by both, from 2005 to 2019.
How do Grenada and Guinea rank globally for dealing with construction permits: time?
Grenada ranks 84th and Guinea ranks 81st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs Guinea: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/grenada/guinea/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/grenada/guinea/">Grenada vs Guinea: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.