Grenada vs San Marino: Dealing with construction permits: Time (days) (Time days)

Grenada
146 days
in 2019
San Marino
145.5 days
in 2019
Grenada rank
84th
San Marino rank
87th

Dealing with construction permits: Time (days) (Time days) over time

  • Grenada
  • San Marino
050100150200200520122019

How they compare

Grenada currently reports 146 days against 145.5 days in San Marino, a difference of 0.5 days.

The two have swapped places 2 times across 8 shared years of data; in 2012 it was Grenada ahead.

Grenada ranks 84th and San Marino ranks 87th of 188 countries.

San Marino has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher dealing with construction permits: time, Grenada or San Marino?
Grenada, at 146 days against 145.5 days in San Marino as of 2019.
What is the difference in dealing with construction permits: time between Grenada and San Marino?
0.5 days, with Grenada ahead.
How many years of comparable data are there for Grenada and San Marino?
8 years are reported by both, from 2012 to 2019.
How do Grenada and San Marino rank globally for dealing with construction permits: time?
Grenada ranks 84th and San Marino ranks 87th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Grenada vs San Marino: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/grenada/san-marino/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/grenada/san-marino/">Grenada vs San Marino: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.