Grenada vs Spain: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Grenada
- Spain
How they compare
Spain currently reports 147 days against 146 days in Grenada, a difference of 1 days.
Across all 15 years both countries report, Spain has been ahead every year.
Grenada ranks 82nd and Spain ranks 81st of 185 countries.
Spain has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Grenada | Spain | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 146 days | 193 days | 47 days | Spain |
| 2010s | 146 days | 161 days | 15 days | Spain |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Grenada or Spain?
- Spain, at 147 days against 146 days in Grenada as of 2019.
- What is the difference in dealing with construction permits: time between Grenada and Spain?
- 1 days, with Spain ahead.
- How many years of comparable data are there for Grenada and Spain?
- 15 years are reported by both, from 2005 to 2019.
- How do Grenada and Spain rank globally for dealing with construction permits: time?
- Grenada ranks 82nd and Spain ranks 81st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.