Guatemala vs Nicaragua: Dealing with construction permits: Time

Guatemala
226 days
in 2019
Nicaragua
225 days
in 2019
Guatemala rank
23rd
Nicaragua rank
25th

Dealing with construction permits: Time over time

  • Guatemala
  • Nicaragua
0100200300400200520122019

How they compare

Guatemala currently reports 226 days against 225 days in Nicaragua, a difference of 1 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Guatemala ahead.

Guatemala ranks 23rd and Nicaragua ranks 25th of 185 countries.

Across the 2 decades both report, Guatemala averaged higher in 1 and Nicaragua in 1.

Head to head by decade

Decade Guatemala Nicaragua Difference Ahead
2000s 266.6 days 229 days 37.6 days Guatemala
2010s 182.9 days 225 days 42.1 days Nicaragua

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Guatemala or Nicaragua?
Guatemala, at 226 days against 225 days in Nicaragua as of 2019.
What is the difference in dealing with construction permits: time between Guatemala and Nicaragua?
1 days, with Guatemala ahead.
How many years of comparable data are there for Guatemala and Nicaragua?
15 years are reported by both, from 2005 to 2019.
How do Guatemala and Nicaragua rank globally for dealing with construction permits: time?
Guatemala ranks 23rd and Nicaragua ranks 25th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.