Dealing with construction permits: Time in Nicaragua
Nicaragua: Dealing with construction permits: Time was 225 days in 2019. ▬ Flat
Dealing with construction permits: Time in Nicaragua, 2005–2019
Source: World Bank. Measured in days.
Analysis
Nicaragua recorded 225 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.
The figure is unchanged over ten years.
Over the whole period, dealing with construction permits: time in Nicaragua peaked at 235 days in 2005 and was at its lowest, 225 days, in 2007.
That places Nicaragua 25th out of 185 countries with data for 2019, putting it in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 229 days | 225 days | 235 days | 5 |
| 2010s | 225 days | 225 days | 225 days | 10 |
Countries ranked near Nicaragua
More private sector data for Nicaragua
- Merchandise trade 95.9% (2025)
- Food imports 16.6% (2024)
- Manufactures imports 68.6% (2024)
- Merchandise imports 12.43 billion current US$ (2025)
- Food exports 42.6% (2024)
- Manufactures exports 37.0% (2024)
- Merchandise exports 8.89 billion current US$ (2025)
- Commercial service exports 1.19 billion current US$ (2024)
- Transport services 57.8% (2024)
- Computer, communications and other services 9.6% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Nicaragua?
- Dealing with construction permits: time in Nicaragua was 225 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Nicaragua?
- The highest recorded value was 235 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Nicaragua?
- The lowest recorded value was 225 days in 2007.
- How does Nicaragua rank for dealing with construction permits: time?
- Nicaragua ranks 25th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Nicaragua?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Nicaragua data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.