Dealing with construction permits: Time (days) (Time days) in Nicaragua

Nicaragua: Dealing with construction permits: Time was 225 days in 2019. ▬ Flat

Latest (2019)
225 days
Change on year
unchanged
World rank
27th
of 188 countries
All-time high
235 days
in 2005
All-time low
225 days
in 2007
Years of data
15
2005–2019

Dealing with construction permits: Time in Nicaragua, 2005–2019

0501001502002502005201220192005: 235 days2006: 235 days2007: 225 days2008: 225 days2009: 225 days2010: 225 days2011: 225 days2012: 225 days2013: 225 days2014: 225 days2015: 225 days2016: 225 days2017: 225 days2018: 225 days2019: 225 days

Source: World Bank. Measured in days.

Analysis

Nicaragua recorded 225 days for dealing with construction permits: time in 2019. That is the lowest value across all 15 years on record.

The figure is unchanged over ten years.

Over the whole period, dealing with construction permits: time in Nicaragua peaked at 235 days in 2005 and was at its lowest, 225 days, in 2007.

That places Nicaragua 27th out of 188 countries with data for 2019, putting it in the top quarter.

Dealing with construction permits: Time in Nicaragua, year by year

Annual values for Dealing with construction permits: Time (days) in Nicaragua, 2005 to 2019.
Year days Change
2005 235 days —
2006 235 days +0.0%
2007 225 days -4.3%
2008 225 days +0.0%
2009 225 days +0.0%
2010 225 days +0.0%
2011 225 days +0.0%
2012 225 days +0.0%
2013 225 days +0.0%
2014 225 days +0.0%
2015 225 days +0.0%
2016 225 days +0.0%
2017 225 days +0.0%
2018 225 days +0.0%
2019 225 days +0.0%

Nicaragua compared with similar countries

  • Nicaragua's 225 days is above the median for lower middle income countries, which is 159 days, 1.4× the median. (47 countries reporting)
  • Nicaragua's 225 days is above the median for Latin America & Caribbean, which is 165 days, 1.4× the median. (33 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 229 days 225 days 235 days 5
2010s 225 days 225 days 225 days 10

Countries ranked near Nicaragua

  1. 24 Bolivia 235 days compare
  2. 25 Chad 226 days compare
  3. 25 Guatemala 226 days compare
  4. 28 Suriname 223 days compare
  5. 29 Austria 222 days compare
  6. 30 Central African Republic 219 days compare

See the full ranking of 188 places →

More private sector data for Nicaragua

All data for Nicaragua →

Frequently asked questions

What is dealing with construction permits: time in Nicaragua?
Dealing with construction permits: time in Nicaragua was 225 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Nicaragua?
The highest recorded value was 235 days in 2005.
What is the lowest dealing with construction permits: time recorded in Nicaragua?
The lowest recorded value was 225 days in 2007.
How does Nicaragua rank for dealing with construction permits: time?
Nicaragua ranks 27th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Nicaragua?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Nicaragua data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Nicaragua. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/nicaragua/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/nicaragua/">Dealing with construction permits: Time in Nicaragua</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.