Guatemala vs Suriname: Dealing with construction permits: Time

Guatemala
226 days
in 2019
Suriname
223 days
in 2019
Guatemala rank
23rd
Suriname rank
26th

Dealing with construction permits: Time over time

  • Guatemala
  • Suriname
0100200300400200520122019

How they compare

Guatemala currently reports 226 days against 223 days in Suriname, a difference of 3 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Guatemala ahead.

Guatemala ranks 23rd and Suriname ranks 26th of 185 countries.

Across the 2 decades both report, Guatemala averaged higher in 1 and Suriname in 1.

Head to head by decade

Decade Guatemala Suriname Difference Ahead
2000s 266.6 days 253 days 13.6 days Guatemala
2010s 182.9 days 232 days 49.1 days Suriname

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Guatemala or Suriname?
Guatemala, at 226 days against 223 days in Suriname as of 2019.
What is the difference in dealing with construction permits: time between Guatemala and Suriname?
3 days, with Guatemala ahead.
How many years of comparable data are there for Guatemala and Suriname?
15 years are reported by both, from 2005 to 2019.
How do Guatemala and Suriname rank globally for dealing with construction permits: time?
Guatemala ranks 23rd and Suriname ranks 26th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.