Dealing with construction permits: Time in Suriname

Suriname: Dealing with construction permits: Time was 223 days in 2019. ▼ Falling

Latest (2019)
223 days
Change on year
unchanged
World rank
26th
of 185 countries
All-time high
253 days
in 2005
All-time low
223 days
in 2013
Years of data
15
2005–2019

Dealing with construction permits: Time in Suriname, 2005–2019

01002003002005201220192005: 253 days2006: 253 days2007: 253 days2008: 253 days2009: 253 days2010: 253 days2011: 253 days2012: 253 days2013: 223 days2014: 223 days2015: 223 days2016: 223 days2017: 223 days2018: 223 days2019: 223 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Suriname stood at 223 days. That is the lowest value across all 15 years on record.

The figure is down 11.9% over ten years.

Over the whole period, dealing with construction permits: time in Suriname peaked at 253 days in 2005 and was at its lowest, 223 days, in 2013.

That places Suriname 26th out of 185 countries with data for 2019, putting it in the top quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 253 days 253 days 253 days 5
2010s 232 days 223 days 253 days 10

Countries ranked near Suriname

  1. 23 Chad 226 days compare
  2. 23 Guatemala 226 days compare
  3. 25 Nicaragua 225 days compare
  4. 27 Austria 222 days compare
  5. 28 Central African Republic 219 days compare
  6. 29 Papua New Guinea 217 days compare

See the full ranking of 187 places →

More private sector data for Suriname

All data for Suriname →

Frequently asked questions

What is dealing with construction permits: time in Suriname?
Dealing with construction permits: time in Suriname was 223 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Suriname?
The highest recorded value was 253 days in 2005.
What is the lowest dealing with construction permits: time recorded in Suriname?
The lowest recorded value was 223 days in 2013.
How does Suriname rank for dealing with construction permits: time?
Suriname ranks 26th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Suriname?
Over the last ten years it is down 11.9%. The long-run trend across the full record is falling.
Where does this Suriname data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.