Guinea vs Spain: Dealing with construction permits: Time

Guinea
151 days
in 2019
Spain
147 days
in 2019
Guinea rank
79th
Spain rank
81st

Dealing with construction permits: Time over time

  • Guinea
  • Spain
050100150200200520122019

How they compare

Guinea currently reports 151 days against 147 days in Spain, a difference of 4 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Spain ahead.

Guinea ranks 79th and Spain ranks 81st of 185 countries.

Across the 2 decades both report, Guinea averaged higher in 1 and Spain in 1.

Head to head by decade

Decade Guinea Spain Difference Ahead
2000s 181 days 193 days 12 days Spain
2010s 173.1 days 161 days 12.1 days Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Guinea or Spain?
Guinea, at 151 days against 147 days in Spain as of 2019.
What is the difference in dealing with construction permits: time between Guinea and Spain?
4 days, with Guinea ahead.
How many years of comparable data are there for Guinea and Spain?
15 years are reported by both, from 2005 to 2019.
How do Guinea and Spain rank globally for dealing with construction permits: time?
Guinea ranks 79th and Spain ranks 81st of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.