Guyana vs Timor-Leste: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Guyana
- Timor-Leste
How they compare
Guyana currently reports 208 days against 207 days in Timor-Leste, a difference of 1 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Timor-Leste ahead.
Guyana ranks 32nd and Timor-Leste ranks 33rd of 185 countries.
Across the 2 decades both report, Guyana averaged higher in 1 and Timor-Leste in 1.
Head to head by decade
| Decade | Guyana | Timor-Leste | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 203.6 days | 207 days | 3.4 days | Timor-Leste |
| 2010s | 208 days | 207 days | 1 days | Guyana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Guyana or Timor-Leste?
- Guyana, at 208 days against 207 days in Timor-Leste as of 2019.
- What is the difference in dealing with construction permits: time between Guyana and Timor-Leste?
- 1 days, with Guyana ahead.
- How many years of comparable data are there for Guyana and Timor-Leste?
- 15 years are reported by both, from 2005 to 2019.
- How do Guyana and Timor-Leste rank globally for dealing with construction permits: time?
- Guyana ranks 32nd and Timor-Leste ranks 33rd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.