Hong Kong vs Jordan: Dealing with construction permits: Time (days) (Time days)

Hong Kong
69 days
in 2019
Jordan
66 days
in 2019
Hong Kong rank
176th
Jordan rank
178th

Dealing with construction permits: Time (days) (Time days) over time

  • Hong Kong
  • Jordan
50100150200200520122019

How they compare

Hong Kong currently reports 69 days against 66 days in Jordan, a difference of 3 days.

Across all 15 years both countries report, Hong Kong has been ahead every year.

Hong Kong ranks 176th and Jordan ranks 178th of 188 countries.

Hong Kong has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Hong Kong Jordan Difference Ahead
2000s 180.2 days 89.4 days 90.8 days Hong Kong
2010s 74.1 days 66.3 days 7.8 days Hong Kong

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Hong Kong or Jordan?
Hong Kong, at 69 days against 66 days in Jordan as of 2019.
What is the difference in dealing with construction permits: time between Hong Kong and Jordan?
3 days, with Hong Kong ahead.
How many years of comparable data are there for Hong Kong and Jordan?
15 years are reported by both, from 2005 to 2019.
How do Hong Kong and Jordan rank globally for dealing with construction permits: time?
Hong Kong ranks 176th and Jordan ranks 178th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong vs Jordan: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/jordan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/jordan/">Hong Kong vs Jordan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.