Hong Kong, China vs Sao Tome and Principe: Dealing with construction permits: Time

Hong Kong, China
69 days
in 2019
Sao Tome and Principe
67 days
in 2019
Hong Kong, China rank
176th
Sao Tome and Principe rank
177th

Dealing with construction permits: Time over time

  • Hong Kong, China
  • Sao Tome and Principe
50100150200200520122019

How they compare

Hong Kong, China currently reports 69 days against 67 days in Sao Tome and Principe, a difference of 2 days.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Sao Tome and Principe ahead.

Hong Kong, China ranks 176th and Sao Tome and Principe ranks 177th of 188 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Hong Kong, China Sao Tome and Principe Difference Ahead
2000s 180.2 days 221 days 40.8 days Sao Tome and Principe
2010s 74.1 days 86.6 days 12.5 days Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Hong Kong, China or Sao Tome and Principe?
Hong Kong, China, at 69 days against 67 days in Sao Tome and Principe as of 2019.
What is the difference in dealing with construction permits: time between Hong Kong, China and Sao Tome and Principe?
2 days, with Hong Kong, China ahead.
How many years of comparable data are there for Hong Kong, China and Sao Tome and Principe?
15 years are reported by both, from 2005 to 2019.
How do Hong Kong, China and Sao Tome and Principe rank globally for dealing with construction permits: time?
Hong Kong, China ranks 176th and Sao Tome and Principe ranks 177th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong, China vs Sao Tome and Principe: Dealing with construction permits: Time. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/sao-tome-and-principe/">Hong Kong, China vs Sao Tome and Principe: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.