Hong Kong, China vs Ukraine: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Hong Kong, China
- Ukraine
How they compare
Ukraine currently reports 72.5 days against 69 days in Hong Kong, China, a difference of 3.5 days.
That makes Ukraine's figure about 1.1 times Hong Kong, China's.
Across all 15 years both countries report, Ukraine has been ahead every year.
Hong Kong, China ranks 175th and Ukraine ranks 172nd of 187 countries.
Ukraine has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Hong Kong, China | Ukraine | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 180.2 days | 540.2 days | 360 days | Ukraine |
| 2010s | 74.1 days | 176.75 days | 102.65 days | Ukraine |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Hong Kong, China or Ukraine?
- Ukraine, at 72.5 days against 69 days in Hong Kong, China as of 2019.
- What is the difference in dealing with construction permits: time between Hong Kong, China and Ukraine?
- 3.5 days, with Ukraine ahead.
- How many years of comparable data are there for Hong Kong, China and Ukraine?
- 15 years are reported by both, from 2005 to 2019.
- How do Hong Kong, China and Ukraine rank globally for dealing with construction permits: time?
- Hong Kong, China ranks 175th and Ukraine ranks 172nd of 187 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.