Hong Kong, China vs Ukraine: Dealing with construction permits: Time

Hong Kong, China
69 days
in 2019
Ukraine
72.5 days
in 2019
Hong Kong, China rank
175th
Ukraine rank
172nd

Dealing with construction permits: Time over time

  • Hong Kong, China
  • Ukraine
100200300400500600200520122019

How they compare

Ukraine currently reports 72.5 days against 69 days in Hong Kong, China, a difference of 3.5 days.

That makes Ukraine's figure about 1.1 times Hong Kong, China's.

Across all 15 years both countries report, Ukraine has been ahead every year.

Hong Kong, China ranks 175th and Ukraine ranks 172nd of 187 countries.

Ukraine has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Hong Kong, China Ukraine Difference Ahead
2000s 180.2 days 540.2 days 360 days Ukraine
2010s 74.1 days 176.75 days 102.65 days Ukraine

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Hong Kong, China or Ukraine?
Ukraine, at 72.5 days against 69 days in Hong Kong, China as of 2019.
What is the difference in dealing with construction permits: time between Hong Kong, China and Ukraine?
3.5 days, with Ukraine ahead.
How many years of comparable data are there for Hong Kong, China and Ukraine?
15 years are reported by both, from 2005 to 2019.
How do Hong Kong, China and Ukraine rank globally for dealing with construction permits: time?
Hong Kong, China ranks 175th and Ukraine ranks 172nd of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong, China vs Ukraine: Dealing with construction permits: Time. Statizoid. Retrieved 19 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/ukraine/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hong-kong-sar-china/ukraine/">Hong Kong, China vs Ukraine: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.