Dealing with construction permits: Time in Ukraine
Ukraine: Dealing with construction permits: Time was 72.5 days in 2019. ◆ Volatile
Dealing with construction permits: Time in Ukraine, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Ukraine is 72.5 days, measured in 2019. That is the lowest value across all 15 years on record.
That represents a change of down 8.2% on the previous year and down 86.2% over ten years.
Over the whole period, dealing with construction permits: time in Ukraine peaked at 558 days in 2008 and was at its lowest, 72.5 days, in 2019.
Ukraine ranks 170th of 185 countries on this measure, in the bottom quarter.
The series is highly variable year to year, so single readings are best treated with caution.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 540.2 days | 526 days | 558 days | 5 |
| 2010s | 176.75 days | 72.5 days | 403 days | 10 |
Countries ranked near Ukraine
More private sector data for Ukraine
- Merchandise trade 57.9% (2025)
- Food imports 10.5% (2024)
- Manufactures imports 66.5% (2024)
- Merchandise imports 83.57 billion current US$ (2025)
- Food exports 58.7% (2024)
- Manufactures exports 30.5% (2024)
- Merchandise exports 40.37 billion current US$ (2025)
- Commercial service exports 16.64 billion current US$ (2024)
- Transport services 16.5% (2024)
- Computer, communications and other services 16.5% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Ukraine?
- Dealing with construction permits: time in Ukraine was 72.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Ukraine?
- The highest recorded value was 558 days in 2008.
- What is the lowest dealing with construction permits: time recorded in Ukraine?
- The lowest recorded value was 72.5 days in 2019.
- How does Ukraine rank for dealing with construction permits: time?
- Ukraine ranks 170th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Ukraine?
- Over the last ten years it is down 86.2%. The long-run trend across the full record is volatile.
- Where does this Ukraine data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.