Dealing with construction permits: Time in Ukraine

Ukraine: Dealing with construction permits: Time was 72.5 days in 2019. ◆ Volatile

Latest (2019)
72.5 days
Change on year
down 8.2%
World rank
170th
of 185 countries
All-time high
558 days
in 2008
All-time low
72.5 days
in 2019
Years of data
15
2005–2019

Dealing with construction permits: Time in Ukraine, 2005–2019

1002003004005006002005201220192005: 539 days2006: 539 days2007: 539 days2008: 558 days2009: 526 days2010: 403 days2011: 403 days2012: 380 days2013: 96 days2014: 85 days2015: 85 days2016: 85 days2017: 79 days2018: 79 days2019: 72.5 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Ukraine is 72.5 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 8.2% on the previous year and down 86.2% over ten years.

Over the whole period, dealing with construction permits: time in Ukraine peaked at 558 days in 2008 and was at its lowest, 72.5 days, in 2019.

Ukraine ranks 170th of 185 countries on this measure, in the bottom quarter.

The series is highly variable year to year, so single readings are best treated with caution.

Averages by decade

DecadeAverage LowestHighest Years
2000s 540.2 days 526 days 558 days 5
2010s 176.75 days 72.5 days 403 days 10

Countries ranked near Ukraine

  1. 167 United States 80.6 days compare
  2. 168 Tonga 77 days compare
  3. 169 Lithuania 74 days compare
  4. 171 Bahrain 71 days compare
  5. 172 Burundi 70 days compare
  6. 173 Hong Kong 69 days compare

See the full ranking of 187 places →

More private sector data for Ukraine

All data for Ukraine →

Frequently asked questions

What is dealing with construction permits: time in Ukraine?
Dealing with construction permits: time in Ukraine was 72.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Ukraine?
The highest recorded value was 558 days in 2008.
What is the lowest dealing with construction permits: time recorded in Ukraine?
The lowest recorded value was 72.5 days in 2019.
How does Ukraine rank for dealing with construction permits: time?
Ukraine ranks 170th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Ukraine?
Over the last ten years it is down 86.2%. The long-run trend across the full record is volatile.
Where does this Ukraine data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.