Hungary vs Italy: Dealing with construction permits: Time (days) (Time days)

Hungary
192.5 days
in 2019
Italy
189.5 days
in 2019
Hungary rank
42nd
Italy rank
45th

Dealing with construction permits: Time (days) (Time days) over time

  • Hungary
  • Italy
050100150200200520122019

How they compare

Hungary currently reports 192.5 days against 189.5 days in Italy, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Italy ahead.

Hungary ranks 42nd and Italy ranks 45th of 188 countries.

Italy has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Hungary Italy Difference Ahead
2000s 202.2 days 219 days 16.8 days Italy
2010s 197.9 days 210.15 days 12.25 days Italy

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Hungary or Italy?
Hungary, at 192.5 days against 189.5 days in Italy as of 2019.
What is the difference in dealing with construction permits: time between Hungary and Italy?
3 days, with Hungary ahead.
How many years of comparable data are there for Hungary and Italy?
15 years are reported by both, from 2005 to 2019.
How do Hungary and Italy rank globally for dealing with construction permits: time?
Hungary ranks 42nd and Italy ranks 45th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hungary vs Italy: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hungary/italy/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/hungary/italy/">Hungary vs Italy: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.