Dealing with construction permits: Time in Hungary

Hungary: Dealing with construction permits: Time was 192.5 days in 2019. ▬ Flat

Latest (2019)
192.5 days
Change on year
unchanged
World rank
40th
of 185 countries
All-time high
212.5 days
in 2015
All-time low
183 days
in 2010
Years of data
15
2005–2019

Dealing with construction permits: Time in Hungary, 2005–2019

0501001502002005201220192005: 205 days2006: 205 days2007: 205 days2008: 198 days2009: 198 days2010: 183 days2011: 183 days2012: 183 days2013: 198 days2014: 209.5 days2015: 212.5 days2016: 212.5 days2017: 212.5 days2018: 192.5 days2019: 192.5 days

Source: World Bank. Measured in days.

Analysis

Hungary recorded 192.5 days for dealing with construction permits: time in 2019.

The figure is down 2.8% over ten years.

Over the whole period, dealing with construction permits: time in Hungary peaked at 212.5 days in 2015 and was at its lowest, 183 days, in 2010.

That places Hungary 40th out of 185 countries with data for 2019, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 202.2 days 198 days 205 days 5
2010s 197.9 days 183 days 212.5 days 10

Countries ranked near Hungary

  1. 37 Afghanistan 199 days compare
  2. 38 Chile 195 days compare
  3. 39 Madagascar 194 days compare
  4. 41 Latvia 192 days compare
  5. 42 Dominica 191 days compare
  6. 43 Italy 189.5 days compare

See the full ranking of 187 places →

More private sector data for Hungary

All data for Hungary →

Frequently asked questions

What is dealing with construction permits: time in Hungary?
Dealing with construction permits: time in Hungary was 192.5 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Hungary?
The highest recorded value was 212.5 days in 2015.
What is the lowest dealing with construction permits: time recorded in Hungary?
The lowest recorded value was 183 days in 2010.
How does Hungary rank for dealing with construction permits: time?
Hungary ranks 40th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Hungary?
Over the last ten years it is down 2.8%. The long-run trend across the full record is flat.
Where does this Hungary data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.