Dealing with construction permits: Time in Hungary
Hungary: Dealing with construction permits: Time was 192.5 days in 2019. ▬ Flat
Dealing with construction permits: Time in Hungary, 2005–2019
Source: World Bank. Measured in days.
Analysis
Hungary recorded 192.5 days for dealing with construction permits: time in 2019.
The figure is down 2.8% over ten years.
Over the whole period, dealing with construction permits: time in Hungary peaked at 212.5 days in 2015 and was at its lowest, 183 days, in 2010.
That places Hungary 40th out of 185 countries with data for 2019, putting it in the top quarter.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 202.2 days | 198 days | 205 days | 5 |
| 2010s | 197.9 days | 183 days | 212.5 days | 10 |
Countries ranked near Hungary
More private sector data for Hungary
- Merchandise trade 133.1% (2025)
- Food imports 7.0% (2025)
- Manufactures imports 72.5% (2025)
- Merchandise imports 159.20 billion current US$ (2025)
- Food exports 8.6% (2025)
- Manufactures exports 80.4% (2025)
- Merchandise exports 168.84 billion current US$ (2025)
- Commercial service exports 42.88 billion current US$ (2025)
- Transport services 27.5% (2025)
- Computer, communications and other services 53.5% (2025)
Frequently asked questions
- What is dealing with construction permits: time in Hungary?
- Dealing with construction permits: time in Hungary was 192.5 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Hungary?
- The highest recorded value was 212.5 days in 2015.
- What is the lowest dealing with construction permits: time recorded in Hungary?
- The lowest recorded value was 183 days in 2010.
- How does Hungary rank for dealing with construction permits: time?
- Hungary ranks 40th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Hungary?
- Over the last ten years it is down 2.8%. The long-run trend across the full record is flat.
- Where does this Hungary data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.