Iceland vs Sri Lanka: Dealing with construction permits: Time (days) (Time days)

Iceland
84 days
in 2019
Sri Lanka
86 days
in 2019
Iceland rank
166th
Sri Lanka rank
163rd

Dealing with construction permits: Time (days) (Time days) over time

  • Iceland
  • Sri Lanka
050100150200200520122019

How they compare

Sri Lanka currently reports 86 days against 84 days in Iceland, a difference of 2 days.

Across all 15 years both countries report, Sri Lanka has been ahead every year.

Iceland ranks 166th and Sri Lanka ranks 163rd of 188 countries.

Sri Lanka has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Iceland Sri Lanka Difference Ahead
2000s 96.6 days 176.2 days 79.6 days Sri Lanka
2010s 84 days 138.3 days 54.3 days Sri Lanka

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Iceland or Sri Lanka?
Sri Lanka, at 86 days against 84 days in Iceland as of 2019.
What is the difference in dealing with construction permits: time between Iceland and Sri Lanka?
2 days, with Sri Lanka ahead.
How many years of comparable data are there for Iceland and Sri Lanka?
15 years are reported by both, from 2005 to 2019.
How do Iceland and Sri Lanka rank globally for dealing with construction permits: time?
Iceland ranks 166th and Sri Lanka ranks 163rd of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Iceland vs Sri Lanka: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/iceland/sri-lanka/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/iceland/sri-lanka/">Iceland vs Sri Lanka: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.