Dealing with construction permits: Time (days) (Time days) in Sri Lanka

Sri Lanka: Dealing with construction permits: Time was 86 days in 2019. ▼ Falling

Latest (2019)
86 days
Change on year
unchanged
World rank
163rd
of 188 countries
All-time high
177 days
in 2009
All-time low
86 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Sri Lanka, 2005–2019

0501001502002005201220192005: 176 days2006: 176 days2007: 176 days2008: 176 days2009: 177 days2010: 177 days2011: 177 days2012: 176 days2013: 168 days2014: 168 days2015: 115 days2016: 115 days2017: 115 days2018: 86 days2019: 86 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Sri Lanka is 86 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 51.4% over ten years.

Over the whole period, dealing with construction permits: time in Sri Lanka peaked at 177 days in 2009 and was at its lowest, 86 days, in 2018.

That places Sri Lanka 163rd out of 188 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Sri Lanka, year by year

Annual values for Dealing with construction permits: Time (days) in Sri Lanka, 2005 to 2019.
Year days Change
2005 176 days —
2006 176 days +0.0%
2007 176 days +0.0%
2008 176 days +0.0%
2009 177 days +0.6%
2010 177 days +0.0%
2011 177 days +0.0%
2012 176 days -0.6%
2013 168 days -4.5%
2014 168 days +0.0%
2015 115 days -31.5%
2016 115 days +0.0%
2017 115 days +0.0%
2018 86 days -25.2%
2019 86 days +0.0%

Sri Lanka compared with similar countries

  • Sri Lanka's 86 days is below the median for upper middle income countries, which is 131 days, 66% of the median. (55 countries reporting)
  • Sri Lanka's 86 days is below the median for South Asia, which is 129 days, 67% of the median. (6 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 176.2 days 176 days 177 days 5
2010s 138.3 days 86 days 177 days 10

Countries ranked near Sri Lanka

  1. 160 Qatar 87.5 days compare
  2. 161 Liberia 87 days compare
  3. 161 Syria 87 days compare
  4. 163 United Kingdom 86 days compare
  5. 165 Micronesia (country) 85 days compare
  6. 166 Iceland 84 days compare

See the full ranking of 188 places →

More private sector data for Sri Lanka

All data for Sri Lanka →

Frequently asked questions

What is dealing with construction permits: time in Sri Lanka?
Dealing with construction permits: time in Sri Lanka was 86 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Sri Lanka?
The highest recorded value was 177 days in 2009.
What is the lowest dealing with construction permits: time recorded in Sri Lanka?
The lowest recorded value was 86 days in 2018.
How does Sri Lanka rank for dealing with construction permits: time?
Sri Lanka ranks 163rd out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Sri Lanka?
Over the last ten years it is down 51.4%. The long-run trend across the full record is falling.
Where does this Sri Lanka data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Sri Lanka. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/sri-lanka/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/sri-lanka/">Dealing with construction permits: Time in Sri Lanka</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.