Iceland vs Taiwan: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Iceland
- Taiwan
How they compare
Iceland currently reports 84 days against 82 days in Taiwan, a difference of 2 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Taiwan ahead.
Iceland ranks 163rd and Taiwan ranks 166th of 185 countries.
Taiwan has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Iceland | Taiwan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 96.6 days | 138 days | 41.4 days | Taiwan |
| 2010s | 84 days | 98.4 days | 14.4 days | Taiwan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Iceland or Taiwan?
- Iceland, at 84 days against 82 days in Taiwan as of 2019.
- What is the difference in dealing with construction permits: time between Iceland and Taiwan?
- 2 days, with Iceland ahead.
- How many years of comparable data are there for Iceland and Taiwan?
- 15 years are reported by both, from 2005 to 2019.
- How do Iceland and Taiwan rank globally for dealing with construction permits: time?
- Iceland ranks 163rd and Taiwan ranks 166th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.