Dealing with construction permits: Time in Taiwan

Taiwan: Dealing with construction permits: Time was 82 days in 2019. ▼ Falling

Latest (2019)
82 days
Change on year
unchanged
World rank
166th
of 185 countries
All-time high
138 days
in 2005
All-time low
82 days
in 2018
Years of data
15
2005–2019

Dealing with construction permits: Time in Taiwan, 2005–2019

0501001502005201220192005: 138 days2006: 138 days2007: 138 days2008: 138 days2009: 138 days2010: 138 days2011: 124 days2012: 93 days2013: 93 days2014: 93 days2015: 93 days2016: 93 days2017: 93 days2018: 82 days2019: 82 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Taiwan is 82 days, measured in 2019. That is the lowest value across all 15 years on record.

That represents a change of down 40.6% over ten years.

Over the whole period, dealing with construction permits: time in Taiwan peaked at 138 days in 2005 and was at its lowest, 82 days, in 2018.

That places Taiwan 166th out of 185 countries with data for 2019, putting it in the bottom quarter.

The long-run direction has been consistently falling across the 15 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 138 days 138 days 138 days 5
2010s 98.4 days 82 days 138 days 10

Countries ranked near Taiwan

  1. 163 Iceland 84 days compare
  2. 164 Brunei 83 days compare
  3. 165 Mexico 82.12 days compare
  4. 167 United States 80.6 days compare
  5. 168 Tonga 77 days compare
  6. 169 Lithuania 74 days compare

See the full ranking of 187 places →

More private sector data for Taiwan

All data for Taiwan →

Frequently asked questions

What is dealing with construction permits: time in Taiwan?
Dealing with construction permits: time in Taiwan was 82 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Taiwan?
The highest recorded value was 138 days in 2005.
What is the lowest dealing with construction permits: time recorded in Taiwan?
The lowest recorded value was 82 days in 2018.
How does Taiwan rank for dealing with construction permits: time?
Taiwan ranks 166th out of 185 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Taiwan?
Over the last ten years it is down 40.6%. The long-run trend across the full record is falling.
Where does this Taiwan data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.