India vs Panama: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- India
- Panama
How they compare
India currently reports 106.22 days against 105 days in Panama, a difference of 1.22 days.
Across all 15 years both countries report, India has been ahead every year.
India ranks 129th and Panama ranks 130th of 185 countries.
India has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | India | Panama | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 202 days | 141.2 days | 60.8 days | India |
| 2010s | 166.8 days | 107.8 days | 59 days | India |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, India or Panama?
- India, at 106.22 days against 105 days in Panama as of 2019.
- What is the difference in dealing with construction permits: time between India and Panama?
- 1.22 days, with India ahead.
- How many years of comparable data are there for India and Panama?
- 15 years are reported by both, from 2005 to 2019.
- How do India and Panama rank globally for dealing with construction permits: time?
- India ranks 129th and Panama ranks 130th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.