Israel vs Madagascar: Dealing with construction permits: Time (days) (Time days)

Israel
200 days
in 2019
Madagascar
194 days
in 2019
Israel rank
38th
Madagascar rank
41st

Dealing with construction permits: Time (days) (Time days) over time

  • Israel
  • Madagascar
050100150200200520122019

How they compare

Israel currently reports 200 days against 194 days in Madagascar, a difference of 6 days.

Across all 15 years both countries report, Israel has been ahead every year.

Israel ranks 38th and Madagascar ranks 41st of 188 countries.

Israel has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Israel Madagascar Difference Ahead
2000s 207 days 155.4 days 51.6 days Israel
2010s 204.2 days 186.2 days 18 days Israel

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Israel or Madagascar?
Israel, at 200 days against 194 days in Madagascar as of 2019.
What is the difference in dealing with construction permits: time between Israel and Madagascar?
6 days, with Israel ahead.
How many years of comparable data are there for Israel and Madagascar?
15 years are reported by both, from 2005 to 2019.
How do Israel and Madagascar rank globally for dealing with construction permits: time?
Israel ranks 38th and Madagascar ranks 41st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Israel vs Madagascar: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/israel/madagascar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/israel/madagascar/">Israel vs Madagascar: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.