Israel vs East Timor: Dealing with construction permits: Time (days) (Time days)

Israel
200 days
in 2019
East Timor
207 days
in 2019
Israel rank
38th
East Timor rank
35th

Dealing with construction permits: Time (days) (Time days) over time

  • Israel
  • East Timor
050100150200200520122019

How they compare

East Timor currently reports 207 days against 200 days in Israel, a difference of 7 days.

Across all 15 years both countries report, East Timor has been ahead every year.

Israel ranks 38th and East Timor ranks 35th of 188 countries.

East Timor has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Israel East Timor Difference Ahead
2000s 207 days 207 days 0 days —
2010s 204.2 days 207 days 2.8 days East Timor

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Israel or East Timor?
East Timor, at 207 days against 200 days in Israel as of 2019.
What is the difference in dealing with construction permits: time between Israel and East Timor?
7 days, with East Timor ahead.
How many years of comparable data are there for Israel and East Timor?
15 years are reported by both, from 2005 to 2019.
How do Israel and East Timor rank globally for dealing with construction permits: time?
Israel ranks 38th and East Timor ranks 35th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Israel vs East Timor: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/israel/timor-leste/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/israel/timor-leste/">Israel vs East Timor: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.