Italy vs Kiribati: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Italy
- Kiribati
How they compare
Italy currently reports 189.5 days against 185 days in Kiribati, a difference of 4.5 days.
Across all 15 years both countries report, Italy has been ahead every year.
Italy ranks 43rd and Kiribati ranks 45th of 185 countries.
Italy has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Italy | Kiribati | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 219 days | 184.6 days | 34.4 days | Italy |
| 2010s | 210.15 days | 185 days | 25.15 days | Italy |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Italy or Kiribati?
- Italy, at 189.5 days against 185 days in Kiribati as of 2019.
- What is the difference in dealing with construction permits: time between Italy and Kiribati?
- 4.5 days, with Italy ahead.
- How many years of comparable data are there for Italy and Kiribati?
- 15 years are reported by both, from 2005 to 2019.
- How do Italy and Kiribati rank globally for dealing with construction permits: time?
- Italy ranks 43rd and Kiribati ranks 45th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.