Jamaica vs Maldives: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Jamaica
- Maldives
How they compare
Jamaica currently reports 140.5 days against 140 days in Maldives, a difference of 0.5 days.
Across all 15 years both countries report, Jamaica has been ahead every year.
Jamaica ranks 90th and Maldives ranks 91st of 185 countries.
Jamaica has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Jamaica | Maldives | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 228 days | 140 days | 88 days | Jamaica |
| 2010s | 159.55 days | 140 days | 19.55 days | Jamaica |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Jamaica or Maldives?
- Jamaica, at 140.5 days against 140 days in Maldives as of 2019.
- What is the difference in dealing with construction permits: time between Jamaica and Maldives?
- 0.5 days, with Jamaica ahead.
- How many years of comparable data are there for Jamaica and Maldives?
- 15 years are reported by both, from 2005 to 2019.
- How do Jamaica and Maldives rank globally for dealing with construction permits: time?
- Jamaica ranks 90th and Maldives ranks 91st of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.