Jamaica vs Mongolia: Dealing with construction permits: Time

Jamaica
140.5 days
in 2019
Mongolia
137 days
in 2019
Jamaica rank
90th
Mongolia rank
93rd

Dealing with construction permits: Time over time

  • Jamaica
  • Mongolia
0100200300200520122019

How they compare

Jamaica currently reports 140.5 days against 137 days in Mongolia, a difference of 3.5 days.

The two have swapped places 2 times across 15 shared years of data; in 2005 it was Jamaica ahead.

Jamaica ranks 90th and Mongolia ranks 93rd of 185 countries.

Jamaica has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Jamaica Mongolia Difference Ahead
2000s 228 days 218 days 10 days Jamaica
2010s 159.55 days 155 days 4.55 days Jamaica

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Jamaica or Mongolia?
Jamaica, at 140.5 days against 137 days in Mongolia as of 2019.
What is the difference in dealing with construction permits: time between Jamaica and Mongolia?
3.5 days, with Jamaica ahead.
How many years of comparable data are there for Jamaica and Mongolia?
15 years are reported by both, from 2005 to 2019.
How do Jamaica and Mongolia rank globally for dealing with construction permits: time?
Jamaica ranks 90th and Mongolia ranks 93rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.