Kazakhstan vs Mauritania: Dealing with construction permits: Time

Kazakhstan
102.5 days
in 2019
Mauritania
104 days
in 2019
Kazakhstan rank
136th
Mauritania rank
133rd

Dealing with construction permits: Time over time

  • Kazakhstan
  • Mauritania
0100200300200520122019

How they compare

Mauritania currently reports 104 days against 102.5 days in Kazakhstan, a difference of 1.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Kazakhstan ahead.

Kazakhstan ranks 136th and Mauritania ranks 133rd of 185 countries.

Kazakhstan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kazakhstan Mauritania Difference Ahead
2000s 259.4 days 153 days 106.4 days Kazakhstan
2010s 168.85 days 108.9 days 59.95 days Kazakhstan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kazakhstan or Mauritania?
Mauritania, at 104 days against 102.5 days in Kazakhstan as of 2019.
What is the difference in dealing with construction permits: time between Kazakhstan and Mauritania?
1.5 days, with Mauritania ahead.
How many years of comparable data are there for Kazakhstan and Mauritania?
15 years are reported by both, from 2005 to 2019.
How do Kazakhstan and Mauritania rank globally for dealing with construction permits: time?
Kazakhstan ranks 136th and Mauritania ranks 133rd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.