Kazakhstan vs Montenegro: Dealing with construction permits: Time

Kazakhstan
102.5 days
in 2019
Montenegro
102 days
in 2019
Kazakhstan rank
136th
Montenegro rank
137th

Dealing with construction permits: Time over time

  • Kazakhstan
  • Montenegro
0100200300200520122019

How they compare

Kazakhstan currently reports 102.5 days against 102 days in Montenegro, a difference of 0.5 days.

The two have swapped places 4 times across 14 shared years of data; in 2006 it was Kazakhstan ahead.

Kazakhstan ranks 136th and Montenegro ranks 137th of 185 countries.

Kazakhstan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kazakhstan Montenegro Difference Ahead
2000s 258.25 days 211.25 days 47 days Kazakhstan
2010s 168.85 days 168.4 days 0.45 days Kazakhstan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kazakhstan or Montenegro?
Kazakhstan, at 102.5 days against 102 days in Montenegro as of 2019.
What is the difference in dealing with construction permits: time between Kazakhstan and Montenegro?
0.5 days, with Kazakhstan ahead.
How many years of comparable data are there for Kazakhstan and Montenegro?
14 years are reported by both, from 2006 to 2019.
How do Kazakhstan and Montenegro rank globally for dealing with construction permits: time?
Kazakhstan ranks 136th and Montenegro ranks 137th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.