Kenya vs Netherlands: Dealing with construction permits: Time (days) (Time days)

Kenya
159 days
in 2019
Netherlands
161 days
in 2019
Kenya rank
74th
Netherlands rank
71st

Dealing with construction permits: Time (days) (Time days) over time

  • Kenya
  • Netherlands
050100150200200520122019

How they compare

Netherlands currently reports 161 days against 159 days in Kenya, a difference of 2 days.

Across all 15 years both countries report, Netherlands has been ahead every year.

Kenya ranks 74th and Netherlands ranks 71st of 188 countries.

Netherlands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kenya Netherlands Difference Ahead
2000s 137.2 days 179.5 days 42.3 days Netherlands
2010s 144.3 days 164.7 days 20.4 days Netherlands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kenya or Netherlands?
Netherlands, at 161 days against 159 days in Kenya as of 2019.
What is the difference in dealing with construction permits: time between Kenya and Netherlands?
2 days, with Netherlands ahead.
How many years of comparable data are there for Kenya and Netherlands?
15 years are reported by both, from 2005 to 2019.
How do Kenya and Netherlands rank globally for dealing with construction permits: time?
Kenya ranks 74th and Netherlands ranks 71st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kenya vs Netherlands: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kenya/netherlands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kenya/netherlands/">Kenya vs Netherlands: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.