Dealing with construction permits: Time (days) (Time days) in Kenya

Kenya: Dealing with construction permits: Time was 159 days in 2019. ▲ Rising

Latest (2019)
159 days
Change on year
unchanged
World rank
74th
of 188 countries
All-time high
160 days
in 2015
All-time low
120 days
in 2009
Years of data
15
2005–2019

Dealing with construction permits: Time in Kenya, 2005–2019

0501001502005201220192005: 158 days2006: 158 days2007: 125 days2008: 125 days2009: 120 days2010: 131 days2011: 131 days2012: 131 days2013: 122 days2014: 131 days2015: 160 days2016: 160 days2017: 159 days2018: 159 days2019: 159 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Kenya stood at 159 days.

The figure is up 32.5% over ten years.

Over the whole period, dealing with construction permits: time in Kenya peaked at 160 days in 2015 and was at its lowest, 120 days, in 2009.

Kenya ranks 74th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently rising across the 15 years of available data.

Dealing with construction permits: Time in Kenya, year by year

Annual values for Dealing with construction permits: Time (days) in Kenya, 2005 to 2019.
Year days Change
2005 158 days —
2006 158 days +0.0%
2007 125 days -20.9%
2008 125 days +0.0%
2009 120 days -4.0%
2010 131 days +9.2%
2011 131 days +0.0%
2012 131 days +0.0%
2013 122 days -6.9%
2014 131 days +7.4%
2015 160 days +22.1%
2016 160 days +0.0%
2017 159 days -0.6%
2018 159 days +0.0%
2019 159 days +0.0%

Kenya compared with similar countries

  • Kenya's 159 days is above the median for lower middle income countries, which is 159 days, 1.0× the median. (47 countries reporting)
  • Kenya's 159 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.1× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 137.2 days 120 days 158 days 5
2010s 144.3 days 122 days 160 days 10

Countries ranked near Kenya

  1. 71 Netherlands 161 days compare
  2. 72 Namibia 160 days compare
  3. 72 Portugal 160 days compare
  4. 75 Belarus 158 days compare
  5. 76 Tajikistan 157 days compare
  6. 77 Switzerland 156 days compare

See the full ranking of 188 places →

More private sector data for Kenya

All data for Kenya →

Frequently asked questions

What is dealing with construction permits: time in Kenya?
Dealing with construction permits: time in Kenya was 159 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kenya?
The highest recorded value was 160 days in 2015.
What is the lowest dealing with construction permits: time recorded in Kenya?
The lowest recorded value was 120 days in 2009.
How does Kenya rank for dealing with construction permits: time?
Kenya ranks 74th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Kenya?
Over the last ten years it is up 32.5%. The long-run trend across the full record is rising.
Where does this Kenya data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Kenya. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kenya/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/kenya/">Dealing with construction permits: Time in Kenya</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.