Dealing with construction permits: Time (days) (Time days) in Netherlands

Netherlands: Dealing with construction permits: Time was 161 days in 2019. ▼ Falling

Latest (2019)
161 days
Change on year
unchanged
World rank
71st
of 188 countries
All-time high
179.5 days
in 2005
All-time low
161 days
in 2012
Years of data
15
2005–2019

Dealing with construction permits: Time in Netherlands, 2005–2019

0501001502002005201220192005: 179.5 days2006: 179.5 days2007: 179.5 days2008: 179.5 days2009: 179.5 days2010: 179.5 days2011: 179.5 days2012: 161 days2013: 161 days2014: 161 days2015: 161 days2016: 161 days2017: 161 days2018: 161 days2019: 161 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Netherlands is 161 days, measured in 2019. That is the lowest value across all 15 years on record.

Compared with earlier readings it is down 10.3% over ten years.

Over the whole period, dealing with construction permits: time in Netherlands peaked at 179.5 days in 2005 and was at its lowest, 161 days, in 2012.

That places Netherlands 71st out of 188 countries with data for 2019, putting it in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Netherlands, year by year

Annual values for Dealing with construction permits: Time (days) in Netherlands, 2005 to 2019.
Year days Change
2005 179.5 days —
2006 179.5 days +0.0%
2007 179.5 days +0.0%
2008 179.5 days +0.0%
2009 179.5 days +0.0%
2010 179.5 days +0.0%
2011 179.5 days +0.0%
2012 161 days -10.3%
2013 161 days +0.0%
2014 161 days +0.0%
2015 161 days +0.0%
2016 161 days +0.0%
2017 161 days +0.0%
2018 161 days +0.0%
2019 161 days +0.0%

Netherlands compared with similar countries

  • Netherlands's 161 days is above the median for high income countries, which is 144.75 days, 1.1× the median. (62 countries reporting)
  • Netherlands's 161 days is above the median for Europe & Central Asia, which is 156 days, 1.0× the median. (49 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 179.5 days 179.5 days 179.5 days 5
2010s 164.7 days 161 days 179.5 days 10

Countries ranked near Netherlands

  1. 68 Congo 164 days compare
  2. 68 Ireland 164 days compare
  3. 70 Cote d'Ivoire 163 days compare
  4. 72 Namibia 160 days compare
  5. 72 Portugal 160 days compare
  6. 74 Kenya 159 days compare

See the full ranking of 188 places →

More private sector data for Netherlands

All data for Netherlands →

Frequently asked questions

What is dealing with construction permits: time in Netherlands?
Dealing with construction permits: time in Netherlands was 161 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Netherlands?
The highest recorded value was 179.5 days in 2005.
What is the lowest dealing with construction permits: time recorded in Netherlands?
The lowest recorded value was 161 days in 2012.
How does Netherlands rank for dealing with construction permits: time?
Netherlands ranks 71st out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Netherlands?
Over the last ten years it is down 10.3%. The long-run trend across the full record is falling.
Where does this Netherlands data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Netherlands. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/netherlands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/netherlands/">Dealing with construction permits: Time in Netherlands</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.