Dealing with construction permits: Time in Netherlands
Netherlands: Dealing with construction permits: Time was 161 days in 2019. ▼ Falling
Dealing with construction permits: Time in Netherlands, 2005–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Netherlands is 161 days, measured in 2019. That is the lowest value across all 15 years on record.
Compared with earlier readings it is down 10.3% over ten years.
Over the whole period, dealing with construction permits: time in Netherlands peaked at 179.5 days in 2005 and was at its lowest, 161 days, in 2012.
That places Netherlands 69th out of 185 countries with data for 2019, putting it in the middle of the range.
The long-run direction has been consistently falling across the 15 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 179.5 days | 179.5 days | 179.5 days | 5 |
| 2010s | 164.7 days | 161 days | 179.5 days | 10 |
Countries ranked near Netherlands
More private sector data for Netherlands
- Merchandise trade 139.5% (2025)
- Food imports 13.3% (2024)
- Manufactures imports 64.7% (2024)
- Merchandise imports 870.44 billion current US$ (2025)
- Food exports 16.4% (2024)
- Manufactures exports 62.8% (2024)
- Merchandise exports 989.24 billion current US$ (2025)
- Commercial service exports 306.53 billion current US$ (2024)
- Transport services 18.2% (2024)
- Computer, communications and other services 64.2% (2024)
Frequently asked questions
- What is dealing with construction permits: time in Netherlands?
- Dealing with construction permits: time in Netherlands was 161 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Netherlands?
- The highest recorded value was 179.5 days in 2005.
- What is the lowest dealing with construction permits: time recorded in Netherlands?
- The lowest recorded value was 161 days in 2012.
- How does Netherlands rank for dealing with construction permits: time?
- Netherlands ranks 69th out of 185 countries with data for 2019.
- Is dealing with construction permits: time rising or falling in Netherlands?
- Over the last ten years it is down 10.3%. The long-run trend across the full record is falling.
- Where does this Netherlands data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.