Kiribati vs Tanzania: Dealing with construction permits: Time (days) (Time days)

Kiribati
185 days
in 2019
Tanzania
184 days
in 2019
Kiribati rank
47th
Tanzania rank
48th

Dealing with construction permits: Time (days) (Time days) over time

  • Kiribati
  • Tanzania
050100150200250200520122019

How they compare

Kiribati currently reports 185 days against 184 days in Tanzania, a difference of 1 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Tanzania ahead.

Kiribati ranks 47th and Tanzania ranks 48th of 188 countries.

Tanzania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kiribati Tanzania Difference Ahead
2000s 184.6 days 216 days 31.4 days Tanzania
2010s 185 days 214.1 days 29.1 days Tanzania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kiribati or Tanzania?
Kiribati, at 185 days against 184 days in Tanzania as of 2019.
What is the difference in dealing with construction permits: time between Kiribati and Tanzania?
1 days, with Kiribati ahead.
How many years of comparable data are there for Kiribati and Tanzania?
15 years are reported by both, from 2005 to 2019.
How do Kiribati and Tanzania rank globally for dealing with construction permits: time?
Kiribati ranks 47th and Tanzania ranks 48th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kiribati vs Tanzania: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kiribati/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kiribati/tanzania/">Kiribati vs Tanzania: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.