Dealing with construction permits: Time (days) (Time days) in Tanzania

Tanzania: Dealing with construction permits: Time was 184 days in 2019. ▼ Falling

Latest (2019)
184 days
Change on year
unchanged
World rank
48th
of 188 countries
All-time high
236 days
in 2015
All-time low
184 days
in 2017
Years of data
15
2005–2019

Dealing with construction permits: Time in Tanzania, 2005–2019

0501001502002502005201220192005: 216 days2006: 216 days2007: 216 days2008: 216 days2009: 216 days2010: 222 days2011: 222 days2012: 222 days2013: 222 days2014: 229 days2015: 236 days2016: 236 days2017: 184 days2018: 184 days2019: 184 days

Source: World Bank. Measured in days.

Analysis

In 2019, dealing with construction permits: time in Tanzania stood at 184 days. That is the lowest value across all 15 years on record.

The figure is down 14.8% over ten years.

Over the whole period, dealing with construction permits: time in Tanzania peaked at 236 days in 2015 and was at its lowest, 184 days, in 2017.

Tanzania ranks 48th of 188 countries on this measure, in the middle of the range.

The long-run direction has been consistently falling across the 15 years of available data.

Dealing with construction permits: Time in Tanzania, year by year

Annual values for Dealing with construction permits: Time (days) in Tanzania, 2005 to 2019.
Year days Change
2005 216 days —
2006 216 days +0.0%
2007 216 days +0.0%
2008 216 days +0.0%
2009 216 days +0.0%
2010 222 days +2.8%
2011 222 days +0.0%
2012 222 days +0.0%
2013 222 days +0.0%
2014 229 days +3.2%
2015 236 days +3.1%
2016 236 days +0.0%
2017 184 days -22.0%
2018 184 days +0.0%
2019 184 days +0.0%

Tanzania compared with similar countries

  • Tanzania's 184 days is above the median for lower middle income countries, which is 159 days, 1.2× the median. (47 countries reporting)
  • Tanzania's 184 days is above the median for Sub-Saharan Africa, which is 143.5 days, 1.3× the median. (46 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 216 days 216 days 216 days 5
2010s 214.1 days 184 days 236 days 10

Countries ranked near Tanzania

  1. 45 Italy 189.5 days compare
  2. 46 Zambia 188 days compare
  3. 47 Kiribati 185 days compare
  4. 48 Angola 184 days compare
  5. 48 Yemen 184 days compare
  6. 51 Lesotho 183 days compare

See the full ranking of 188 places →

More private sector data for Tanzania

All data for Tanzania →

Frequently asked questions

What is dealing with construction permits: time in Tanzania?
Dealing with construction permits: time in Tanzania was 184 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Tanzania?
The highest recorded value was 236 days in 2015.
What is the lowest dealing with construction permits: time recorded in Tanzania?
The lowest recorded value was 184 days in 2017.
How does Tanzania rank for dealing with construction permits: time?
Tanzania ranks 48th out of 188 countries with data for 2019.
Is dealing with construction permits: time rising or falling in Tanzania?
Over the last ten years it is down 14.8%. The long-run trend across the full record is falling.
Where does this Tanzania data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 15 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Time in Tanzania. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/tanzania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-time-days/tanzania/">Dealing with construction permits: Time in Tanzania</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.