Kiribati vs Yemen, Rep.: Dealing with construction permits: Time

Kiribati
185 days
in 2019
Yemen, Rep.
184 days
in 2015
Kiribati rank
45th
Yemen, Rep. rank
46th

Dealing with construction permits: Time over time

  • Kiribati
  • Yemen, Rep.
050100150200200520122019

How they compare

Kiribati currently reports 185 days against 184 days in Yemen, Rep., a difference of 1 days.

Across all 11 years both countries report, Kiribati has been ahead every year.

Kiribati ranks 45th and Yemen, Rep. ranks 46th of 185 countries.

Kiribati has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kiribati Yemen, Rep. Difference Ahead
2000s 184.6 days 109 days 75.6 days Kiribati
2010s 185 days 159 days 26 days Kiribati

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kiribati or Yemen, Rep.?
Kiribati, at 185 days against 184 days in Yemen, Rep. as of 2019.
What is the difference in dealing with construction permits: time between Kiribati and Yemen, Rep.?
1 days, with Kiribati ahead.
How many years of comparable data are there for Kiribati and Yemen, Rep.?
11 years are reported by both, from 2005 to 2015.
How do Kiribati and Yemen, Rep. rank globally for dealing with construction permits: time?
Kiribati ranks 45th and Yemen, Rep. ranks 46th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.