Dealing with construction permits: Time in Yemen

Yemen: Dealing with construction permits: Time was 184 days in 2015. ▲ Rising

Latest (2015)
184 days
Change on year
unchanged
World rank
46th
of 185 countries
All-time high
184 days
in 2012
All-time low
109 days
in 2005
Years of data
11
2005–2015

Dealing with construction permits: Time in Yemen, 2005–2015

0501001502002005201020152005: 109 days2006: 109 days2007: 109 days2008: 109 days2009: 109 days2010: 109 days2011: 109 days2012: 184 days2013: 184 days2014: 184 days2015: 184 days

Source: World Bank. Measured in days.

Analysis

Yemen recorded 184 days for dealing with construction permits: time in 2015. That is the highest value across all 11 years on record.

The figure is up 68.8% over ten years.

Over the whole period, dealing with construction permits: time in Yemen peaked at 184 days in 2012 and was at its lowest, 109 days, in 2005.

That places Yemen 46th out of 185 countries with data for 2015, putting it in the top quarter.

The long-run direction has been consistently rising across the 11 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 109 days 109 days 109 days 5
2010s 159 days 109 days 184 days 6

Countries ranked near Yemen

  1. 43 Italy 189.5 days compare
  2. 44 Zambia 188 days compare
  3. 45 Kiribati 185 days compare
  4. 46 Angola 184 days compare
  5. 46 Tanzania 184 days compare
  6. 49 Lesotho 183 days compare

See the full ranking of 187 places →

More private sector data for Yemen

All data for Yemen →

Frequently asked questions

What is dealing with construction permits: time in Yemen?
Dealing with construction permits: time in Yemen was 184 days in 2015, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Yemen?
The highest recorded value was 184 days in 2012.
What is the lowest dealing with construction permits: time recorded in Yemen?
The lowest recorded value was 109 days in 2005.
How does Yemen rank for dealing with construction permits: time?
Yemen ranks 46th out of 185 countries with data for 2015.
Is dealing with construction permits: time rising or falling in Yemen?
Over the last ten years it is up 68.8%. The long-run trend across the full record is rising.
Where does this Yemen data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.