Korea, Rep. vs Malaysia: Dealing with construction permits: Time

Korea, Rep.
27.5 days
in 2019
Malaysia
41 days
in 2019
Korea, Rep. rank
185th
Malaysia rank
182nd

Dealing with construction permits: Time over time

  • Korea, Rep.
  • Malaysia
0100200300200520122019

How they compare

Malaysia currently reports 41 days against 27.5 days in Korea, Rep., a difference of 13.5 days.

That makes Malaysia's figure about 1.5 times Korea, Rep.'s.

Across all 15 years both countries report, Malaysia has been ahead every year.

Korea, Rep. ranks 185th and Malaysia ranks 182nd of 185 countries.

Malaysia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Korea, Rep. Malaysia Difference Ahead
2000s 30.2 days 275.4 days 245.2 days Malaysia
2010s 27.65 days 106.2 days 78.55 days Malaysia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Korea, Rep. or Malaysia?
Malaysia, at 41 days against 27.5 days in Korea, Rep. as of 2019.
What is the difference in dealing with construction permits: time between Korea, Rep. and Malaysia?
13.5 days, with Malaysia ahead.
How many years of comparable data are there for Korea, Rep. and Malaysia?
15 years are reported by both, from 2005 to 2019.
How do Korea, Rep. and Malaysia rank globally for dealing with construction permits: time?
Korea, Rep. ranks 185th and Malaysia ranks 182nd of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.