South Korea vs Malaysia: Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- South Korea
- Malaysia
How they compare
Malaysia currently reports 41 days against 27.5 days in South Korea, a difference of 13.5 days.
That makes Malaysia's figure about 1.5 times South Korea's.
Across all 15 years both countries report, Malaysia has been ahead every year.
South Korea ranks 188th and Malaysia ranks 185th of 188 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | South Korea | Malaysia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 30.2 days | 275.4 days | 245.2 days | Malaysia |
| 2010s | 27.65 days | 106.2 days | 78.55 days | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, South Korea or Malaysia?
- Malaysia, at 41 days against 27.5 days in South Korea as of 2019.
- What is the difference in dealing with construction permits: time between South Korea and Malaysia?
- 13.5 days, with Malaysia ahead.
- How many years of comparable data are there for South Korea and Malaysia?
- 15 years are reported by both, from 2005 to 2019.
- How do South Korea and Malaysia rank globally for dealing with construction permits: time?
- South Korea ranks 188th and Malaysia ranks 185th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.