Korea, Rep. vs Malaysia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Korea, Rep.
- Malaysia
How they compare
Malaysia currently reports 41 days against 27.5 days in Korea, Rep., a difference of 13.5 days.
That makes Malaysia's figure about 1.5 times Korea, Rep.'s.
Across all 15 years both countries report, Malaysia has been ahead every year.
Korea, Rep. ranks 185th and Malaysia ranks 182nd of 185 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Korea, Rep. | Malaysia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 30.2 days | 275.4 days | 245.2 days | Malaysia |
| 2010s | 27.65 days | 106.2 days | 78.55 days | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Korea, Rep. or Malaysia?
- Malaysia, at 41 days against 27.5 days in Korea, Rep. as of 2019.
- What is the difference in dealing with construction permits: time between Korea, Rep. and Malaysia?
- 13.5 days, with Malaysia ahead.
- How many years of comparable data are there for Korea, Rep. and Malaysia?
- 15 years are reported by both, from 2005 to 2019.
- How do Korea, Rep. and Malaysia rank globally for dealing with construction permits: time?
- Korea, Rep. ranks 185th and Malaysia ranks 182nd of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.