Kosovo (UNSCR 1244) vs Slovenia: Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- Kosovo (UNSCR 1244)
- Slovenia
How they compare
Slovenia currently reports 247.5 days against 237 days in Kosovo (UNSCR 1244), a difference of 10.5 days.
The two have swapped places 1 time across 11 shared years of data; in 2009 it was Kosovo (UNSCR 1244) ahead.
Kosovo (UNSCR 1244) ranks 22nd and Slovenia ranks 19th of 188 countries.
Kosovo (UNSCR 1244) has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Kosovo (UNSCR 1244) | Slovenia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 375 days | 292 days | 83 days | Kosovo (UNSCR 1244) |
| 2010s | 267 days | 256.5 days | 10.5 days | Kosovo (UNSCR 1244) |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Kosovo (UNSCR 1244) or Slovenia?
- Slovenia, at 247.5 days against 237 days in Kosovo (UNSCR 1244) as of 2019.
- What is the difference in dealing with construction permits: time between Kosovo (UNSCR 1244) and Slovenia?
- 10.5 days, with Slovenia ahead.
- How many years of comparable data are there for Kosovo (UNSCR 1244) and Slovenia?
- 11 years are reported by both, from 2009 to 2019.
- How do Kosovo (UNSCR 1244) and Slovenia rank globally for dealing with construction permits: time?
- Kosovo (UNSCR 1244) ranks 22nd and Slovenia ranks 19th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.