Kosovo (UNSCR 1244) vs Uzbekistan: Dealing with construction permits: Time (days) (Time days)

Kosovo (UNSCR 1244)
237 days
in 2019
Uzbekistan
246 days
in 2019
Kosovo (UNSCR 1244) rank
22nd
Uzbekistan rank
20th

Dealing with construction permits: Time (days) (Time days) over time

  • Kosovo (UNSCR 1244)
  • Uzbekistan
0100200300400200520122019

How they compare

Uzbekistan currently reports 246 days against 237 days in Kosovo (UNSCR 1244), a difference of 9 days.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Kosovo (UNSCR 1244) ahead.

Kosovo (UNSCR 1244) ranks 22nd and Uzbekistan ranks 20th of 188 countries.

Kosovo (UNSCR 1244) has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kosovo (UNSCR 1244) Uzbekistan Difference Ahead
2000s 375 days 261 days 114 days Kosovo (UNSCR 1244)
2010s 267 days 255.3 days 11.7 days Kosovo (UNSCR 1244)

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kosovo (UNSCR 1244) or Uzbekistan?
Uzbekistan, at 246 days against 237 days in Kosovo (UNSCR 1244) as of 2019.
What is the difference in dealing with construction permits: time between Kosovo (UNSCR 1244) and Uzbekistan?
9 days, with Uzbekistan ahead.
How many years of comparable data are there for Kosovo (UNSCR 1244) and Uzbekistan?
11 years are reported by both, from 2009 to 2019.
How do Kosovo (UNSCR 1244) and Uzbekistan rank globally for dealing with construction permits: time?
Kosovo (UNSCR 1244) ranks 22nd and Uzbekistan ranks 20th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Kosovo (UNSCR 1244) vs Uzbekistan: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kosovo-unscr-1244/uzbekistan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/kosovo-unscr-1244/uzbekistan/">Kosovo (UNSCR 1244) vs Uzbekistan: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.