Kosovo vs Uzbekistan: Dealing with construction permits: Time (days) (Time days)
Dealing with construction permits: Time (days) (Time days) over time
- Kosovo
- Uzbekistan
How they compare
Uzbekistan currently reports 246 days against 237 days in Kosovo, a difference of 9 days.
The two have swapped places 1 time across 11 shared years of data; in 2009 it was Kosovo ahead.
Kosovo ranks 22nd and Uzbekistan ranks 20th of 188 countries.
Kosovo has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Kosovo | Uzbekistan | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 375 days | 261 days | 114 days | Kosovo |
| 2010s | 267 days | 255.3 days | 11.7 days | Kosovo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Kosovo or Uzbekistan?
- Uzbekistan, at 246 days against 237 days in Kosovo as of 2019.
- What is the difference in dealing with construction permits: time between Kosovo and Uzbekistan?
- 9 days, with Uzbekistan ahead.
- How many years of comparable data are there for Kosovo and Uzbekistan?
- 11 years are reported by both, from 2009 to 2019.
- How do Kosovo and Uzbekistan rank globally for dealing with construction permits: time?
- Kosovo ranks 22nd and Uzbekistan ranks 20th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.