Dealing with construction permits: Time in Kosovo
Kosovo: Dealing with construction permits: Time was 237 days in 2019. ▼ Falling
Dealing with construction permits: Time in Kosovo, 2009–2019
Source: World Bank. Measured in days.
Analysis
The most recent figure for dealing with construction permits: time in Kosovo is 237 days, measured in 2019. That is the lowest value across all 11 years on record.
Compared with earlier readings it is down 0.8% on the previous year and down 36.8% over ten years.
Over the whole period, dealing with construction permits: time in Kosovo peaked at 375 days in 2009 and was at its lowest, 237 days, in 2019.
The long-run direction has been consistently falling across the 11 years of available data.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 375 days | 375 days | 375 days | 1 |
| 2010s | 267 days | 237 days | 375 days | 10 |
Countries ranked near Kosovo
More private sector data for Kosovo
- Commercial service exports 4.87 billion current US$ (2025)
- Transport services 20.0% (2025)
- Computer, communications and other services 18.0% (2025)
- Commercial service imports 2.18 billion current US$ (2025)
- Computer, communications and other services 19.3% (2025)
- Travel services 55.9% (2025)
- Travel services 75.7% (2025)
- Transport services 4.5% (2025)
- Insurance and financial services 6.2% (2025)
- Merchandise imports from economies in the Arab World 1.4% (2023)
Frequently asked questions
- What is dealing with construction permits: time in Kosovo?
- Dealing with construction permits: time in Kosovo was 237 days in 2019, according to the World Bank.
- What is the highest dealing with construction permits: time recorded in Kosovo?
- The highest recorded value was 375 days in 2009.
- What is the lowest dealing with construction permits: time recorded in Kosovo?
- The lowest recorded value was 237 days in 2019.
- How does Kosovo rank for dealing with construction permits: time?
- Kosovo ranks 1st out of 1 groups with data for 2019.
- Is dealing with construction permits: time rising or falling in Kosovo?
- Over the last ten years it is down 36.8%. The long-run trend across the full record is falling.
- Where does this Kosovo data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.