Dealing with construction permits: Time in Kosovo

Kosovo: Dealing with construction permits: Time was 237 days in 2019. ▼ Falling

Latest (2019)
237 days
Change on year
down 0.8%
Rank
1st
of 1 groups
All-time high
375 days
in 2009
All-time low
237 days
in 2019
Years of data
11
2009–2019

Dealing with construction permits: Time in Kosovo, 2009–2019

01002003004002009201420192009: 375 days2010: 375 days2011: 373 days2012: 242 days2013: 240 days2014: 241 days2015: 241 days2016: 241 days2017: 241 days2018: 239 days2019: 237 days

Source: World Bank. Measured in days.

Analysis

The most recent figure for dealing with construction permits: time in Kosovo is 237 days, measured in 2019. That is the lowest value across all 11 years on record.

Compared with earlier readings it is down 0.8% on the previous year and down 36.8% over ten years.

Over the whole period, dealing with construction permits: time in Kosovo peaked at 375 days in 2009 and was at its lowest, 237 days, in 2019.

The long-run direction has been consistently falling across the 11 years of available data.

Averages by decade

DecadeAverage LowestHighest Years
2000s 375 days 375 days 375 days 1
2010s 267 days 237 days 375 days 10

Countries ranked near Kosovo

  1. 1 Cambodia 652 days compare
  2. 2 Cyprus 507 days compare
  3. 3 Venezuela 434 days compare
  4. 4 Barbados 377 days compare

See the full ranking of 187 places →

More private sector data for Kosovo

All data for Kosovo →

Frequently asked questions

What is dealing with construction permits: time in Kosovo?
Dealing with construction permits: time in Kosovo was 237 days in 2019, according to the World Bank.
What is the highest dealing with construction permits: time recorded in Kosovo?
The highest recorded value was 375 days in 2009.
What is the lowest dealing with construction permits: time recorded in Kosovo?
The lowest recorded value was 237 days in 2019.
How does Kosovo rank for dealing with construction permits: time?
Kosovo ranks 1st out of 1 groups with data for 2019.
Is dealing with construction permits: time rising or falling in Kosovo?
Over the last ten years it is down 36.8%. The long-run trend across the full record is falling.
Where does this Kosovo data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Time (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 11 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.