Kuwait vs Montenegro: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Kuwait
- Montenegro
How they compare
Kuwait currently reports 103 days against 102 days in Montenegro, a difference of 1 days.
The two have swapped places 1 time across 14 shared years of data; in 2006 it was Montenegro ahead.
Kuwait ranks 134th and Montenegro ranks 137th of 185 countries.
Across the 2 decades both report, Kuwait averaged higher in 1 and Montenegro in 1.
Head to head by decade
| Decade | Kuwait | Montenegro | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 183 days | 211.25 days | 28.25 days | Montenegro |
| 2010s | 182.5 days | 168.4 days | 14.1 days | Kuwait |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Kuwait or Montenegro?
- Kuwait, at 103 days against 102 days in Montenegro as of 2019.
- What is the difference in dealing with construction permits: time between Kuwait and Montenegro?
- 1 days, with Kuwait ahead.
- How many years of comparable data are there for Kuwait and Montenegro?
- 14 years are reported by both, from 2006 to 2019.
- How do Kuwait and Montenegro rank globally for dealing with construction permits: time?
- Kuwait ranks 134th and Montenegro ranks 137th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.