Kuwait vs Montenegro: Dealing with construction permits: Time

Kuwait
103 days
in 2019
Montenegro
102 days
in 2019
Kuwait rank
134th
Montenegro rank
137th

Dealing with construction permits: Time over time

  • Kuwait
  • Montenegro
050100150200250200520122019

How they compare

Kuwait currently reports 103 days against 102 days in Montenegro, a difference of 1 days.

The two have swapped places 1 time across 14 shared years of data; in 2006 it was Montenegro ahead.

Kuwait ranks 134th and Montenegro ranks 137th of 185 countries.

Across the 2 decades both report, Kuwait averaged higher in 1 and Montenegro in 1.

Head to head by decade

Decade Kuwait Montenegro Difference Ahead
2000s 183 days 211.25 days 28.25 days Montenegro
2010s 182.5 days 168.4 days 14.1 days Kuwait

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Kuwait or Montenegro?
Kuwait, at 103 days against 102 days in Montenegro as of 2019.
What is the difference in dealing with construction permits: time between Kuwait and Montenegro?
1 days, with Kuwait ahead.
How many years of comparable data are there for Kuwait and Montenegro?
14 years are reported by both, from 2006 to 2019.
How do Kuwait and Montenegro rank globally for dealing with construction permits: time?
Kuwait ranks 134th and Montenegro ranks 137th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.