Latvia vs Madagascar: Dealing with construction permits: Time

Latvia
192 days
in 2019
Madagascar
194 days
in 2019
Latvia rank
41st
Madagascar rank
39th

Dealing with construction permits: Time over time

  • Latvia
  • Madagascar
050100150200200520122019

How they compare

Madagascar currently reports 194 days against 192 days in Latvia, a difference of 2 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Latvia ahead.

Latvia ranks 41st and Madagascar ranks 39th of 185 countries.

Latvia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Latvia Madagascar Difference Ahead
2000s 219.6 days 155.4 days 64.2 days Latvia
2010s 196.6 days 186.2 days 10.4 days Latvia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Latvia or Madagascar?
Madagascar, at 194 days against 192 days in Latvia as of 2019.
What is the difference in dealing with construction permits: time between Latvia and Madagascar?
2 days, with Madagascar ahead.
How many years of comparable data are there for Latvia and Madagascar?
15 years are reported by both, from 2005 to 2019.
How do Latvia and Madagascar rank globally for dealing with construction permits: time?
Latvia ranks 41st and Madagascar ranks 39th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.